Wednesday, May 30, 2012

Construction update


Every night when I come home from school I can notice the changes on the construction site outside my window. The foundations are beginning to take shape and there is some structure in the huge steel beams that are being laid.  We have a small digger right in the foundations and I am reminded of the story  “Mike Mulligan and Mary-Anne”. Will this poor digger be left in the foundations as the building goes up floor upon floor?


There are two positives that are occurring at the moment. There is no noisy work late into the evenings, apart from the white light flashes from the random welders. AND the men doing the odd bit of welding are wearing welding masks.

Every bit of land is being built on apart from the frontage. Currently the basement is being built as a space where the residents/ workers inside this building can park their bikes. The basement also houses the rubbish and the generators. Basements in buildings in Vietnam serve as another floor, all be it a useful floor. At my schools the guards and off duty workers  live and sleep in the basement. Vietnamese people require so little personal space.

2 comments:

Marg said...

At least the digger is not steam powered like the one in the Mike Mulligan story and no doubt it will not dig itself into a corner of the basement and become trapped.

ianmac said...

Where have all the mud pies gone,
Long time in wallow-ing?
Perhaps the digger could be left in the basement as an emergency generator.